NOTE: David really wrote this and while Citizen Sarah might have put him up to it, she didn’t tell him what to say — just to write about his experience. The moral of the story is: interning at Public Citizen is awesome. Apply today (or tomorrow, if you already have plans for today). But soon!

I began my Public Citizen internship in May of this year and it has been one of the most rewarding and enjoyable work experiences of my life. I finally feel like I’m really fighting the good fight and doing something that matters, not just selling my labor to the highest bidder. The staff here are wonderful. They share a knowledge and passion about the issues they work with that I have only occasionally seen any place else. They also all come from diverse backgrounds and each have their own sense of humor and areas of amazing knowledge and know-how. There is no drama or conflict in the Public Citizen Texas office: we work hard and we have fun doing it.

I have gotten to work extensively with Tom “Smitty” Smith who is one of the most influential and well respected environmental lobbyists in the state. Smitty is a relentless, uncompromising fighter for the causes of clean energy and better policy and it has been amazing honor to work with him. He is willing and able to boldly stand-up to anyone, but much of his success comes from his ability to clearly articulate his positions and bring others over to his side. As a young aspiring political reformer, I have made connections working at Public Citizen Texas that will benefit me for years to come. I have met several major players in Texas politics and the clean energy as well as the environmental movement. I am also a lot more knowledgeable about Texas politics and a host of energy and environmentally related issues as a result of my stay here than I ever imagined becoming.

Working here gave me the opportunity to do research that was actually used in policy debates. I have also helped contribute to media and outreach efforts, and have had multiple opportunities to appear before important players in Texas energy issues like the Low-Level Radioactive Waste Compact Commission and the board of CPS energy. Other interns at Public Citizen Texas have made presentations to legislators and many of them have gone on to have careers in government reform.

APPLY APPLY APPLY APPLY FOR REALS. (Citizen Sarah again)

Read Full Post »

San Antonio, TX —  Nuclear power is the most water intensive energy source available. When San Antonio and all of Texas are suffering from extreme drought and are increasingly in need of sources of drinking water, pursuing more nuclear reactors doesn’t make sense, especially true since cheaper, safer alternatives such as energy efficiency, wind, geothermal and solar energy are available. All use significantly less water than nuclear reactors.

Dr. Lauren Ross’ comments are timely in that the Texas drought continues to worsen, and the Atomic Safety and Licensing Board is still considering nine water-related contentions submitted in opposition to additional reactors by SEED Coalition, Public Citizen and STARE, the South Texas Association for Responsible Energy.

“Nuclear reactors consume vast quantities of water,” said Dr. Lauren Ross, environmental engineer and owner of Glenrose Engineering. “The proposed STP reactors 3 and 4 would withdraw 23,170 gallons per minute from the Colorado River. The two proposed reactors would increase forced evaporation by an additional 37,400 acre-feet per year. The water withdrawal required from the Colorado River to replace evaporated water for all four reactors would be about 74,500 acre-feet per year.”

“Water withdrawal for STP’s nuclear reactors can be a significant fraction of the total river flow. Peak water use so far occurred on September 16, 2001, when the water withdrawal was 48% of the total Colorado river flow near the reactor site,” said Dr. Ross. “From January 1, 2001 through September 30, 2006 there were 69 days when withdrawal for existing STP reactors was equal to or greater than one quarter of the entire river flow.” With four reactors and an increase in the surface water demand, the river flow in the future could go even lower than it is now.

Estimated groundwater use would more than double from an average of 798 gallons per minute for the existing facility over the last five years to a level of 2040 gallons per minute for all four reactors, according to Dr. Ross, but STP wants to wait on analyzing groundwater availability until after the permit is issued.

The year 2008 was one of the driest years on record for Central Texas. Dr. Ross’s most recent research shows that in 2008 water use by LCRA’s firm water customers plus four irrigation operators was more than twice that of the Highland Lakes inflows for the same period, so losses are not being replenished. Moreover, STP’s authorized withdrawal is more than one-third of the total Highland Lakes inflow for 2008.

Water versus Energy

The San Antonio Water System recently filed suit for breach of contract against the Lower Colorado River Authority for $1.23 billion. The suit claims that the water-sharing project was killed by the river authority in order to make sure there would be enough water for power plant deals in Matagorda County. At the same time CPS Energy, the San Antonio municipal utility, seeks to be a partner in the proposed nuclear reactors for Matagorda County. STP’s annual permitted withdrawal from the Colorado River is 102,000 acre-feet per year, incredibly close to the amount in the canceled LCRA/SAWS water agreement, 102,500 acre-feet per year (average).

“Will we reach a point where San Antonio will have to decide which matters most, electricity from nuclear reactors or water for drinking?” asked Alice Alice Canestaro-Garcia, visual artist and member of EnergÍa MÍa. “It makes no sense to build two more reactors, which together would use enough water to fill 1,440 swimming pools in one day.”

Increasing Radioactive Contamination

South Texas Project’s license application fails to evaluate the increasing levels of groundwater tritium, a radioactive isotope of hydrogen that can be dangerous if inhaled, ingested or absorbed through the skin. Tritium emits Beta radiation that causes cancer, cell mutation, and birth defects. “Tritium has been detected in two of the pressure relief wells that collect water leaking from the unlined bottom of the existing main cooling reservoir. Concentrations of tritium have been increasing in both wells, and these concentrations could rise if two more nuclear reactors are built at the site,” said Dr. Ross.

A state water permit proposed for the site fails to address radionuclides such as tritium, and doesn’t require monitoring for total dissolved solids, some metals or the chemicals added by the facility, such as biocides, sulfuric acid, and anti-scalants. There are also no sulfur or sodium limits for the wastewater discharges, even though these are significant components of the water that would be released back to the Colorado River system.

The application’s Environmental Report relies upon a dilution factor of 10 to meet discharge standards, but fails to provide information about how much the waste discharge loads would change with two additional nuclear reactors. It fails to analyze the consequences of the load increases into a system with only a small change in the dilution factor, since the storage volume would increase only 7.4%.

The reactor application admits that “5,700 acre-feet per year leaks through the unlined bottom of the main cooling reservoir into the underlying Gulf Coast Chicot Aquifer” and 68% of it is recovered. The rest migrates underground, seeping into nearby surface water bodies, into pumped wells or the estuaries of the Gulf of Mexico.

“Failure to monitor and regulate leakage through the bottom of the main cooling reservoir constitutes a failure to protect groundwater and surface water from plant operations,” said Dr. Ross.

For more information, visit www.EnergiaMia.org

Read Full Post »

Big event tonight for Austinites concerned about coal! Tonight, Sept. 1, will be an Austin Energy Town Hall Meeting on the City’s generation and climate protection plan. The event will be located at 721 Barton Springs Rd., Rm 130 from 6 – 8:30pm. Please attend this meeting so that Austin Energy can hear your voice and see that Austinites want the city to Quit Coal with all haste!

Public Citizen, PODER, Sierra Club, and several other environmental groups held a press conference this morning to announce the formation of a coalition to help move the City away from burning coal for electricity.  Public Citizen has long been an opponent of coal-fired electricity and the construction of new coal plants, and this new campaign will attempt to get the City of Austin to divest itself from the Fayette Coal Plant, part of which it owns along with the Lower Colorado River Authority.

Watch the video from this morning’s event, and watch for Matthew Johnson, our energy policy analyst.  Sadly, he is not in character as #unfrozencavemanlawyer 🙁

[vimeo 6388102]

Read more from the press release after the jump: (more…)

Read Full Post »

« Newer Posts